# Setup & Maintenance

Create manufacturing masters, work orders, products, process steps, overheads, and shipment details.

# Prepare Muhasib for Manufacturing

### How to Prepare Muhasib for Manufacturing in Muhasib ERP

### Overview

This guide will help you establish the masters, stock, accounts, statuses, processes, and permissions needed for controlled production.

Authorized users can create and progress production records against controlled prerequisites.

### Who can do this

You need access to Relevant Manufacturing view/add/update rights plus item, BOM, inventory, fiscal-year, account, and report.

### Before you start

Confirm active fiscal year, production model, locations, manufactured items, BOMs, units, raw stock, work processes, statuses, overhead/expense accounts, and role separation.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing and Items &amp; Advanced Inventory.

### Prepare Muhasib for Manufacturing

#### Step 1: Confirm whether the deployment uses Work Orders, Production Orders, or

Confirm whether the deployment uses Work Orders, Production Orders, or both.

#### Step 2: Verify manufactured items and approved BOMs

#### Step 3: Create required process, status, and category masters

#### Step 4: Confirm raw-material, WIP, finished-goods, wastage, overhead, and expense locations/accounts

#### Step 5: Verify fiscal period and transaction numbering

#### Step 6: Test permissions and one representative production lifecycle in an isolated

Test permissions and one representative production lifecycle in an isolated database.

### Check your work

Confirm all required masters are selectable and a test lifecycle reconciles quantities, statuses, stock, and accounts.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not begin live production with incomplete BOMs or account mappings.
- Resolve ambiguity between Work Order and Production Order with the product owner.

### Related guides

- [Create a Work Order](https://docs.muhasiberp.com/link/343)
- [Create a Production Order](https://docs.muhasiberp.com/link/346)
- [Create an Item Bill of Materials](https://docs.muhasiberp.com/link/322)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Work Order**](https://docs.muhasiberp.com/link/343).</div>

# Create a Work Order Status

### How to Create a Work Order Status in Muhasib ERP

### Overview

This guide will help you create an approved status used to classify work-order progress.

The status becomes available to allowed work-order workflows.

### Who can do this

You need access to WorkOrderStatus add permission; update/delete rights are separate.

### Before you start

Confirm unique name, business meaning, sequence, terminal/non-terminal behavior, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → Work Order Status.

### Create a Work Order Status

#### Step 1: Search for an equivalent status

#### Step 2: Select New Record

#### Step 3: Enter the approved name and applicable attributes

Enter the approved name and needed attributes.

#### Step 4: Confirm the status has one unambiguous operational meaning

#### Step 5: Select Save once

### Check your work

Reopen the status and confirm it appears in the intended work-order selector.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Avoid synonyms that create unclear reporting.
- Do not remove a historically used status.

### Related guides

- [Create a Work Order](https://docs.muhasiberp.com/link/343)
- [Finalize a Work Order](https://docs.muhasiberp.com/link/345)
- [Retire a Manufacturing Setup Record Safely](https://docs.muhasiberp.com/link/342)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Work Order**](https://docs.muhasiberp.com/link/343).</div>

# Create a Work Process

### How to Create a Work Process in Muhasib ERP

### Overview

This guide will help you create a named production stage that can receive or issue work-in-process.

The process becomes selectable in Work Order and WIP workflows.

### Who can do this

You need access to WorkProcessesAdd; update/delete rights are separate.

### Before you start

Confirm process name, operational definition, normal predecessor/successor, responsible party, location/account implications, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → Work Processes.

### Create a Work Process

#### Step 1: Search for an existing equivalent process

#### Step 2: Select New Record

#### Step 3: Enter a unique, recognizable process name and supported attributes

#### Step 4: Confirm how it fits the production route

#### Step 5: Save once

### Check your work

Reopen it and confirm Select Work Process displays it to an authorized user.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not encode changing dates or jobs in a reusable process name.
- Avoid removing a process referenced by history.

### Related guides

- [Add a BOM, Work Process, and Expense to a Work Order](https://docs.muhasiberp.com/link/344)
- [Issue Stock to a Work Process](https://docs.muhasiberp.com/link/355)
- [Retire a Manufacturing Setup Record Safely](https://docs.muhasiberp.com/link/342)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Add a BOM, Work Process, and Expense to a Work Order**](https://docs.muhasiberp.com/link/344).</div>

# Retire a Manufacturing Setup Record Safely

### How to Retire a Manufacturing Setup Record Safely in Muhasib ERP

### Overview

This guide will help you stop future use of a status, process, or category without damaging production history.

The value is unavailable for new work while history remains interpretable, subject to form capabilities.

### Who can do this

You need access to Relevant update/delete permission and administrative approval.

### Before you start

Identify every active and historical reference, replacement value, reporting effect, and approved retirement date.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → needed setup form.

### Retire a Manufacturing Setup Record Safely

#### Step 1: Locate the exact record

#### Step 2: Review active work/production/WIP dependencies

#### Step 3: Reassign open records through approved workflows if required

#### Step 4: Set inactive when the form supports it

#### Step 5: Use Delete only if runtime dependency checks prove it unused

Use Delete only if system dependency checks prove it unused and removal is separately approved.

#### Step 6: Verify historical reports remain readable

### Check your work

Confirm new selectors exclude the retired value and old records/reports still show it correctly.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not delete a referenced setup record.
- If no inactive option exists, keep it and use naming/governance controls pending product guidance.

### Related guides

- [Create a Work Order Status](https://docs.muhasiberp.com/link/338)
- [Create a Work Process](https://docs.muhasiberp.com/link/339)
- [Create a Production Order Category](https://docs.muhasiberp.com/link/341)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Work Order Status**](https://docs.muhasiberp.com/link/338).</div>

# Create a Work Order

### How to Create a Work Order in Muhasib ERP

### Overview

This guide will help you create a work order containing the planned item, BOM, process, expense, and status information.

Muhasib saves a work order that can be updated and finalized; no stock movement should be assumed before verification.

### Who can do this

You need access to WorkOrderAdd plus item/BOM, process, status, and expense.

### Before you start

Confirm active fiscal year, product/item, planned quantity, BOM, processes, dates, expenses, status, reference, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → Work Order.

### Create a Work Order

#### Step 1: Select New Record

#### Step 2: Enter document/reference, dates, status, and comments

#### Step 3: Select the production item and planned quantity

#### Step 4: Review or add the Item BOM

#### Step 5: Add required Work In Process stages

#### Step 6: Add approved Other Expenses

#### Step 7: Review and select Create once

### Check your work

Reopen the work order and confirm number, status, item/BOM, processes, expenses, quantities, and creator.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Resolve missing fiscal year before entry.
- Search for the work order before retrying a failed response.

### Related guides

- [Add a BOM, Work Process, and Expense to a Work Order](https://docs.muhasiberp.com/link/344)
- [Finalize a Work Order](https://docs.muhasiberp.com/link/345)
- [Create an Item Bill of Materials](https://docs.muhasiberp.com/link/322)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Add a BOM, Work Process, and Expense to a Work Order**](https://docs.muhasiberp.com/link/344).</div>

# Add a BOM, Work Process, and Expense to a Work Order

### How to Add a BOM, Work Process, and Expense to a Work Order in Muhasib ERP

### Overview

This guide will help you complete the material, routing, and more-cost detail required by a work order.

The work order holds its planned material, routing, and more-cost structure.

### Who can do this

You need access to WorkOrder add/update plus relevant item, BOM, WorkProcesses, and expense rights.

### Before you start

Have the approved BOM quantities/units, process sequence, responsible parties, expected quantities, and expense evidence/budget.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open Work Order → Item BOM, Work In Process, and Other Expenses tabs.

### Add a BOM, Work Process, and Expense to a Work Order

#### Step 1: Use Add/Edit Item BOM and confirm raw items, units, and quantities

#### Step 2: Add each Work Process in the intended sequence

#### Step 3: Enter process-specific details and expected quantities

#### Step 4: Add each approved Other Expense with classification and amount

#### Step 5: Review totals and completeness across all tabs

#### Step 6: Save/Update the parent work order once

### Check your work

Reopen every tab and confirm nested records save once and compare and confirm to the approved plan.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Confirm child dialogs were saved before closing the parent.
- Do not silently substitute materials or process order.

### Related guides

- [Create a Work Order](https://docs.muhasiberp.com/link/343)
- [Create a Work Process](https://docs.muhasiberp.com/link/339)
- [Finalize a Work Order](https://docs.muhasiberp.com/link/345)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Work Order**](https://docs.muhasiberp.com/link/343).</div>

# Finalize a Work Order

### Finalize a Work Order

### Overview

This guide will help you finalize a completed work order only after its quantities, processes, and expenses are reconciled.

Muhasib marks the work order finalized; edit restrictions and inventory/accounting effects must be system-verified.

### Who can do this

You need access to WorkOrder update/finalization and relevant review rights.

### Before you start

Confirm all BOM, WIP, output, expense, wastage, status, and evidence requirements and get approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open the saved Work Order and use the runtime `Finilize` action.

### Finalize a Work Order

#### Step 1: Open the exact work order

#### Step 2: Review item/BOM, WIP stages, quantities, status, and expenses

#### Step 3: Resolve incomplete or duplicate child records

#### Step 4: Confirm finalization approval

#### Step 5: Select Finilize once and accept the confirmation

#### Step 6: Record the resulting status and any generated output

### Check your work

Reopen it and compare and confirm finalized status, source details, related stock, reports, and any journal entries.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not finalize incomplete work merely to make it disappear from open lists.
- Search status before repeating the action after a timeout.

### Related guides

- [Create a Work Order](https://docs.muhasiberp.com/link/343)
- [Add a BOM, Work Process, and Expense to a Work Order](https://docs.muhasiberp.com/link/344)
- [Trace Manufacturing Transactions into Inventory and Accounts](https://docs.muhasiberp.com/link/364)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Work Order**](https://docs.muhasiberp.com/link/343).</div>

# Add Production Overhead and Expense

### How to Add Production Overhead and Expense in Muhasib ERP

### Overview

This guide will help you attach approved overhead and direct expense amounts to the correct production-order product.

Muhasib records the production cost component and may update product cost, party balance, and general ledger.

### Who can do this

You need access to Relevant production product, overhead/expense, person, account, and journal.

### Before you start

Confirm production product, cost type, amount, allocation basis, date, party, account, evidence, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open Production Order Product → Add Overhead or Add New Expense.

### Add Production Overhead and Expense

#### Step 1: Select the intended product/order

#### Step 2: Choose overhead or direct-expense treatment according to policy

#### Step 3: Enter date, description, amount, party, and supported account/reference fields

#### Step 4: Confirm allocation basis and avoid duplicate source expenses

#### Step 5: Save once

#### Step 6: Review the generated journal entry when available

### Check your work

Compare and Confirm nested cost, evidence, product/order totals, journal, relevant account, and production-stock valuation.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not add the same invoice through both Expenses and production cost without approved linkage.
- Correct the source record rather than its generated journal.

### Related guides

- [Add a Product to a Production Order](https://docs.muhasiberp.com/link/347)
- [Record Production Wastage](https://docs.muhasiberp.com/link/351)
- [Trace Manufacturing Transactions into Inventory and Accounts](https://docs.muhasiberp.com/link/364)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Add a Product to a Production Order**](https://docs.muhasiberp.com/link/347).</div>

# Record Production Wastage

### How to Record Production Wastage in Muhasib ERP

### Overview

This guide will help you record approved material wastage against the correct production product and WIP stage.

Muhasib records wastage and may reduce WIP quantity/value and recognize a wastage cost.

### Who can do this

You need access to ProductionOrderWastage plus item, location, batch/serial, and production WIP.

### Before you start

Physically check item, quantity, unit, location, batch/serial, stage, reason, recoverable value, evidence, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open Production Order Product → WIP → WIP Wastage Items → Add Wastage Items.

### Record Production Wastage

#### Step 1: Select the correct WIP stage

#### Step 2: Choose the wasted item and exact stock identity

#### Step 3: Enter quantity, unit, reason, and supported value details

#### Step 4: Confirm the quantity does not exceed eligible WIP stock

Confirm the quantity does not exceed allowed WIP stock.

#### Step 5: Save once

#### Step 6: Review related stock and journal effects

### Check your work

Compare and Confirm wastage record, physical evidence, WIP balance, production-stock ledger, product cost, and journal.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not use wastage to conceal unexplained stock loss.
- Correct wrong stock identities through an authorized reversal path.

### Related guides

- [Add Raw Material and WIP Stages to a Production Product](https://docs.muhasiberp.com/link/348)
- [Review Production Order Stock](https://docs.muhasiberp.com/link/362)
- [Trace Manufacturing Transactions into Inventory and Accounts](https://docs.muhasiberp.com/link/364)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Add Raw Material and WIP Stages to a Production Product**](https://docs.muhasiberp.com/link/348).</div>

# Record a Production Shipment

### How to Record a Production Shipment in Muhasib ERP

### Overview

This guide will help you record an authorized shipment linked to the correct production-order product.

Muhasib stores the production shipment and may change production/finished stock and accounting balances.

### Who can do this

You need access to ProductionOrderShipment plus production product, party, stock, and journal.

### Before you start

Confirm product/order, recipient, destination, date, items, quantities, locations, batches/serials, carrier/gate details, reference, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open Production Order Product → Add New Shipment.

### Record a Production Shipment

#### Step 1: Confirm the parent production product

#### Step 2: Enter shipment date, party/destination, reference, and transport/gate details

#### Step 3: Add shipped items and quantities

#### Step 4: Confirm location, batch, serial, and production eligibility

#### Step 5: Save once

#### Step 6: Review the journal and shipment output where available

### Check your work

Compare and Confirm shipment to physical dispatch, parent production product, stock ledger, status, and journal entry.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not use production shipment as a customer sale or delivery unless product policy explicitly defines that relationship.
- Search for the reference before retrying.

### Related guides

- [Add a Product to a Production Order](https://docs.muhasiberp.com/link/347)
- [Review Production Order Stock](https://docs.muhasiberp.com/link/362)
- [Trace Manufacturing Transactions into Inventory and Accounts](https://docs.muhasiberp.com/link/364)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Add a Product to a Production Order**](https://docs.muhasiberp.com/link/347).</div>

# Trace Manufacturing Transactions into Inventory and Accounts

### Trace Manufacturing Transactions into Inventory and Accounts

### Overview

This guide will help you trace production materials, WIP, output, wastage, overhead, expense, and shipment effects into stock and general-ledger records.

You get an evidence-backed manufacturing-to-inventory-to-accounting map and a list of exceptions.

### Who can do this

You need access to Manufacturing inquiry/report, Stock Ledger, Journal Ledger, and Account Ledger.

### Before you start

Have all related transaction numbers, production plan, physical movements, cost evidence, expected account mapping, and cutoff.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open manufacturing inquiries, then Items &amp; Advanced Inventory → Stock Ledger and Muhasib Financials → Journal/Account Ledger.

### Trace Manufacturing Transactions into Inventory and Accounts

#### Step 1: Build the production-order and nested-record timeline

#### Step 2: Identify which records were only saved and which were finalized

#### Step 3: Trace raw-material and WIP quantities through stock ledgers

#### Step 4: Trace produced output, wastage, and shipment quantities

#### Step 5: Trace overhead/expense and inventory-value postings into journals/accounts

#### Step 6: Reconcile quantities, values, debits, credits, and status at the same

Compare and Confirm quantities, values, debits, credits, and status at the same cutoff.

### Check your work

Every finalized movement appears once, production stock reconciles to general stock, and generated journals balance and agree with approved costs.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Check finalization status before declaring a posting missing.
- Correct source manufacturing records rather than generated ledger entries.

### Related guides

- [Reconcile the Production Order Stock Ledger](https://docs.muhasiberp.com/link/363)
- [Trace a Source Transaction into the General Ledger](https://docs.muhasiberp.com/link/237)
- [Review Inventory Movement and Valuation](https://docs.muhasiberp.com/link/301)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Reconcile the Production Order Stock Ledger**](https://docs.muhasiberp.com/link/363).</div>