# Manufacturing

# Concepts & Prerequisites

Prepare items, bills of materials, processes, statuses, stock, and permissions for manufacturing.

# Setup & Maintenance

Create manufacturing masters, work orders, products, process steps, overheads, and shipment details.

# Prepare Muhasib for Manufacturing

### How to Prepare Muhasib for Manufacturing in Muhasib ERP

### Overview

This guide will help you establish the masters, stock, accounts, statuses, processes, and permissions needed for controlled production.

Authorized users can create and progress production records against controlled prerequisites.

### Who can do this

You need access to Relevant Manufacturing view/add/update rights plus item, BOM, inventory, fiscal-year, account, and report.

### Before you start

Confirm active fiscal year, production model, locations, manufactured items, BOMs, units, raw stock, work processes, statuses, overhead/expense accounts, and role separation.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing and Items &amp; Advanced Inventory.

### Prepare Muhasib for Manufacturing

#### Step 1: Confirm whether the deployment uses Work Orders, Production Orders, or

Confirm whether the deployment uses Work Orders, Production Orders, or both.

#### Step 2: Verify manufactured items and approved BOMs

#### Step 3: Create required process, status, and category masters

#### Step 4: Confirm raw-material, WIP, finished-goods, wastage, overhead, and expense locations/accounts

#### Step 5: Verify fiscal period and transaction numbering

#### Step 6: Test permissions and one representative production lifecycle in an isolated

Test permissions and one representative production lifecycle in an isolated database.

### Check your work

Confirm all required masters are selectable and a test lifecycle reconciles quantities, statuses, stock, and accounts.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not begin live production with incomplete BOMs or account mappings.
- Resolve ambiguity between Work Order and Production Order with the product owner.

### Related guides

- [Create a Work Order](https://docs.muhasiberp.com/link/343)
- [Create a Production Order](https://docs.muhasiberp.com/link/346)
- [Create an Item Bill of Materials](https://docs.muhasiberp.com/link/322)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Work Order**](https://docs.muhasiberp.com/link/343).</div>

# Create a Work Order Status

### How to Create a Work Order Status in Muhasib ERP

### Overview

This guide will help you create an approved status used to classify work-order progress.

The status becomes available to allowed work-order workflows.

### Who can do this

You need access to WorkOrderStatus add permission; update/delete rights are separate.

### Before you start

Confirm unique name, business meaning, sequence, terminal/non-terminal behavior, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → Work Order Status.

### Create a Work Order Status

#### Step 1: Search for an equivalent status

#### Step 2: Select New Record

#### Step 3: Enter the approved name and applicable attributes

Enter the approved name and needed attributes.

#### Step 4: Confirm the status has one unambiguous operational meaning

#### Step 5: Select Save once

### Check your work

Reopen the status and confirm it appears in the intended work-order selector.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Avoid synonyms that create unclear reporting.
- Do not remove a historically used status.

### Related guides

- [Create a Work Order](https://docs.muhasiberp.com/link/343)
- [Finalize a Work Order](https://docs.muhasiberp.com/link/345)
- [Retire a Manufacturing Setup Record Safely](https://docs.muhasiberp.com/link/342)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Work Order**](https://docs.muhasiberp.com/link/343).</div>

# Create a Work Process

### How to Create a Work Process in Muhasib ERP

### Overview

This guide will help you create a named production stage that can receive or issue work-in-process.

The process becomes selectable in Work Order and WIP workflows.

### Who can do this

You need access to WorkProcessesAdd; update/delete rights are separate.

### Before you start

Confirm process name, operational definition, normal predecessor/successor, responsible party, location/account implications, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → Work Processes.

### Create a Work Process

#### Step 1: Search for an existing equivalent process

#### Step 2: Select New Record

#### Step 3: Enter a unique, recognizable process name and supported attributes

#### Step 4: Confirm how it fits the production route

#### Step 5: Save once

### Check your work

Reopen it and confirm Select Work Process displays it to an authorized user.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not encode changing dates or jobs in a reusable process name.
- Avoid removing a process referenced by history.

### Related guides

- [Add a BOM, Work Process, and Expense to a Work Order](https://docs.muhasiberp.com/link/344)
- [Issue Stock to a Work Process](https://docs.muhasiberp.com/link/355)
- [Retire a Manufacturing Setup Record Safely](https://docs.muhasiberp.com/link/342)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Add a BOM, Work Process, and Expense to a Work Order**](https://docs.muhasiberp.com/link/344).</div>

# Retire a Manufacturing Setup Record Safely

### How to Retire a Manufacturing Setup Record Safely in Muhasib ERP

### Overview

This guide will help you stop future use of a status, process, or category without damaging production history.

The value is unavailable for new work while history remains interpretable, subject to form capabilities.

### Who can do this

You need access to Relevant update/delete permission and administrative approval.

### Before you start

Identify every active and historical reference, replacement value, reporting effect, and approved retirement date.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → needed setup form.

### Retire a Manufacturing Setup Record Safely

#### Step 1: Locate the exact record

#### Step 2: Review active work/production/WIP dependencies

#### Step 3: Reassign open records through approved workflows if required

#### Step 4: Set inactive when the form supports it

#### Step 5: Use Delete only if runtime dependency checks prove it unused

Use Delete only if system dependency checks prove it unused and removal is separately approved.

#### Step 6: Verify historical reports remain readable

### Check your work

Confirm new selectors exclude the retired value and old records/reports still show it correctly.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not delete a referenced setup record.
- If no inactive option exists, keep it and use naming/governance controls pending product guidance.

### Related guides

- [Create a Work Order Status](https://docs.muhasiberp.com/link/338)
- [Create a Work Process](https://docs.muhasiberp.com/link/339)
- [Create a Production Order Category](https://docs.muhasiberp.com/link/341)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Work Order Status**](https://docs.muhasiberp.com/link/338).</div>

# Create a Work Order

### How to Create a Work Order in Muhasib ERP

### Overview

This guide will help you create a work order containing the planned item, BOM, process, expense, and status information.

Muhasib saves a work order that can be updated and finalized; no stock movement should be assumed before verification.

### Who can do this

You need access to WorkOrderAdd plus item/BOM, process, status, and expense.

### Before you start

Confirm active fiscal year, product/item, planned quantity, BOM, processes, dates, expenses, status, reference, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → Work Order.

### Create a Work Order

#### Step 1: Select New Record

#### Step 2: Enter document/reference, dates, status, and comments

#### Step 3: Select the production item and planned quantity

#### Step 4: Review or add the Item BOM

#### Step 5: Add required Work In Process stages

#### Step 6: Add approved Other Expenses

#### Step 7: Review and select Create once

### Check your work

Reopen the work order and confirm number, status, item/BOM, processes, expenses, quantities, and creator.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Resolve missing fiscal year before entry.
- Search for the work order before retrying a failed response.

### Related guides

- [Add a BOM, Work Process, and Expense to a Work Order](https://docs.muhasiberp.com/link/344)
- [Finalize a Work Order](https://docs.muhasiberp.com/link/345)
- [Create an Item Bill of Materials](https://docs.muhasiberp.com/link/322)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Add a BOM, Work Process, and Expense to a Work Order**](https://docs.muhasiberp.com/link/344).</div>

# Add a BOM, Work Process, and Expense to a Work Order

### How to Add a BOM, Work Process, and Expense to a Work Order in Muhasib ERP

### Overview

This guide will help you complete the material, routing, and more-cost detail required by a work order.

The work order holds its planned material, routing, and more-cost structure.

### Who can do this

You need access to WorkOrder add/update plus relevant item, BOM, WorkProcesses, and expense rights.

### Before you start

Have the approved BOM quantities/units, process sequence, responsible parties, expected quantities, and expense evidence/budget.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open Work Order → Item BOM, Work In Process, and Other Expenses tabs.

### Add a BOM, Work Process, and Expense to a Work Order

#### Step 1: Use Add/Edit Item BOM and confirm raw items, units, and quantities

#### Step 2: Add each Work Process in the intended sequence

#### Step 3: Enter process-specific details and expected quantities

#### Step 4: Add each approved Other Expense with classification and amount

#### Step 5: Review totals and completeness across all tabs

#### Step 6: Save/Update the parent work order once

### Check your work

Reopen every tab and confirm nested records save once and compare and confirm to the approved plan.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Confirm child dialogs were saved before closing the parent.
- Do not silently substitute materials or process order.

### Related guides

- [Create a Work Order](https://docs.muhasiberp.com/link/343)
- [Create a Work Process](https://docs.muhasiberp.com/link/339)
- [Finalize a Work Order](https://docs.muhasiberp.com/link/345)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Work Order**](https://docs.muhasiberp.com/link/343).</div>

# Finalize a Work Order

### Finalize a Work Order

### Overview

This guide will help you finalize a completed work order only after its quantities, processes, and expenses are reconciled.

Muhasib marks the work order finalized; edit restrictions and inventory/accounting effects must be system-verified.

### Who can do this

You need access to WorkOrder update/finalization and relevant review rights.

### Before you start

Confirm all BOM, WIP, output, expense, wastage, status, and evidence requirements and get approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open the saved Work Order and use the runtime `Finilize` action.

### Finalize a Work Order

#### Step 1: Open the exact work order

#### Step 2: Review item/BOM, WIP stages, quantities, status, and expenses

#### Step 3: Resolve incomplete or duplicate child records

#### Step 4: Confirm finalization approval

#### Step 5: Select Finilize once and accept the confirmation

#### Step 6: Record the resulting status and any generated output

### Check your work

Reopen it and compare and confirm finalized status, source details, related stock, reports, and any journal entries.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not finalize incomplete work merely to make it disappear from open lists.
- Search status before repeating the action after a timeout.

### Related guides

- [Create a Work Order](https://docs.muhasiberp.com/link/343)
- [Add a BOM, Work Process, and Expense to a Work Order](https://docs.muhasiberp.com/link/344)
- [Trace Manufacturing Transactions into Inventory and Accounts](https://docs.muhasiberp.com/link/364)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Work Order**](https://docs.muhasiberp.com/link/343).</div>

# Add Production Overhead and Expense

### How to Add Production Overhead and Expense in Muhasib ERP

### Overview

This guide will help you attach approved overhead and direct expense amounts to the correct production-order product.

Muhasib records the production cost component and may update product cost, party balance, and general ledger.

### Who can do this

You need access to Relevant production product, overhead/expense, person, account, and journal.

### Before you start

Confirm production product, cost type, amount, allocation basis, date, party, account, evidence, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open Production Order Product → Add Overhead or Add New Expense.

### Add Production Overhead and Expense

#### Step 1: Select the intended product/order

#### Step 2: Choose overhead or direct-expense treatment according to policy

#### Step 3: Enter date, description, amount, party, and supported account/reference fields

#### Step 4: Confirm allocation basis and avoid duplicate source expenses

#### Step 5: Save once

#### Step 6: Review the generated journal entry when available

### Check your work

Compare and Confirm nested cost, evidence, product/order totals, journal, relevant account, and production-stock valuation.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not add the same invoice through both Expenses and production cost without approved linkage.
- Correct the source record rather than its generated journal.

### Related guides

- [Add a Product to a Production Order](https://docs.muhasiberp.com/link/347)
- [Record Production Wastage](https://docs.muhasiberp.com/link/351)
- [Trace Manufacturing Transactions into Inventory and Accounts](https://docs.muhasiberp.com/link/364)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Add a Product to a Production Order**](https://docs.muhasiberp.com/link/347).</div>

# Record Production Wastage

### How to Record Production Wastage in Muhasib ERP

### Overview

This guide will help you record approved material wastage against the correct production product and WIP stage.

Muhasib records wastage and may reduce WIP quantity/value and recognize a wastage cost.

### Who can do this

You need access to ProductionOrderWastage plus item, location, batch/serial, and production WIP.

### Before you start

Physically check item, quantity, unit, location, batch/serial, stage, reason, recoverable value, evidence, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open Production Order Product → WIP → WIP Wastage Items → Add Wastage Items.

### Record Production Wastage

#### Step 1: Select the correct WIP stage

#### Step 2: Choose the wasted item and exact stock identity

#### Step 3: Enter quantity, unit, reason, and supported value details

#### Step 4: Confirm the quantity does not exceed eligible WIP stock

Confirm the quantity does not exceed allowed WIP stock.

#### Step 5: Save once

#### Step 6: Review related stock and journal effects

### Check your work

Compare and Confirm wastage record, physical evidence, WIP balance, production-stock ledger, product cost, and journal.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not use wastage to conceal unexplained stock loss.
- Correct wrong stock identities through an authorized reversal path.

### Related guides

- [Add Raw Material and WIP Stages to a Production Product](https://docs.muhasiberp.com/link/348)
- [Review Production Order Stock](https://docs.muhasiberp.com/link/362)
- [Trace Manufacturing Transactions into Inventory and Accounts](https://docs.muhasiberp.com/link/364)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Add Raw Material and WIP Stages to a Production Product**](https://docs.muhasiberp.com/link/348).</div>

# Record a Production Shipment

### How to Record a Production Shipment in Muhasib ERP

### Overview

This guide will help you record an authorized shipment linked to the correct production-order product.

Muhasib stores the production shipment and may change production/finished stock and accounting balances.

### Who can do this

You need access to ProductionOrderShipment plus production product, party, stock, and journal.

### Before you start

Confirm product/order, recipient, destination, date, items, quantities, locations, batches/serials, carrier/gate details, reference, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open Production Order Product → Add New Shipment.

### Record a Production Shipment

#### Step 1: Confirm the parent production product

#### Step 2: Enter shipment date, party/destination, reference, and transport/gate details

#### Step 3: Add shipped items and quantities

#### Step 4: Confirm location, batch, serial, and production eligibility

#### Step 5: Save once

#### Step 6: Review the journal and shipment output where available

### Check your work

Compare and Confirm shipment to physical dispatch, parent production product, stock ledger, status, and journal entry.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not use production shipment as a customer sale or delivery unless product policy explicitly defines that relationship.
- Search for the reference before retrying.

### Related guides

- [Add a Product to a Production Order](https://docs.muhasiberp.com/link/347)
- [Review Production Order Stock](https://docs.muhasiberp.com/link/362)
- [Trace Manufacturing Transactions into Inventory and Accounts](https://docs.muhasiberp.com/link/364)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Add a Product to a Production Order**](https://docs.muhasiberp.com/link/347).</div>

# Trace Manufacturing Transactions into Inventory and Accounts

### Trace Manufacturing Transactions into Inventory and Accounts

### Overview

This guide will help you trace production materials, WIP, output, wastage, overhead, expense, and shipment effects into stock and general-ledger records.

You get an evidence-backed manufacturing-to-inventory-to-accounting map and a list of exceptions.

### Who can do this

You need access to Manufacturing inquiry/report, Stock Ledger, Journal Ledger, and Account Ledger.

### Before you start

Have all related transaction numbers, production plan, physical movements, cost evidence, expected account mapping, and cutoff.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open manufacturing inquiries, then Items &amp; Advanced Inventory → Stock Ledger and Muhasib Financials → Journal/Account Ledger.

### Trace Manufacturing Transactions into Inventory and Accounts

#### Step 1: Build the production-order and nested-record timeline

#### Step 2: Identify which records were only saved and which were finalized

#### Step 3: Trace raw-material and WIP quantities through stock ledgers

#### Step 4: Trace produced output, wastage, and shipment quantities

#### Step 5: Trace overhead/expense and inventory-value postings into journals/accounts

#### Step 6: Reconcile quantities, values, debits, credits, and status at the same

Compare and Confirm quantities, values, debits, credits, and status at the same cutoff.

### Check your work

Every finalized movement appears once, production stock reconciles to general stock, and generated journals balance and agree with approved costs.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Check finalization status before declaring a posting missing.
- Correct source manufacturing records rather than generated ledger entries.

### Related guides

- [Reconcile the Production Order Stock Ledger](https://docs.muhasiberp.com/link/363)
- [Trace a Source Transaction into the General Ledger](https://docs.muhasiberp.com/link/237)
- [Review Inventory Movement and Valuation](https://docs.muhasiberp.com/link/301)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Reconcile the Production Order Stock Ledger**](https://docs.muhasiberp.com/link/363).</div>

# Production Orders

Create, build, finalize, update, and correct production orders.

# Create a Production Order Category

### How to Create a Production Order Category in Muhasib ERP

### Overview

This guide will help you create an approved category for organizing production orders.

The category becomes available in allowed Production Order entry and reporting.

### Who can do this

You need access to ProductionOrderCategoryAdd; update/delete rights are separate.

### Before you start

Confirm unique name, reporting purpose, supported attributes, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → Production Order Category.

### Create a Production Order Category

#### Step 1: Search for an equivalent category

#### Step 2: Select New Record

#### Step 3: Enter the approved name and details

#### Step 4: Confirm it supports a lasting reporting distinction

#### Step 5: Save once

### Check your work

Reopen it and confirm it appears in the Production Order selector.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Avoid categories that duplicate statuses or work processes.
- Retire rather than remove historically used categories where possible.

### Related guides

- [Create a Production Order](https://docs.muhasiberp.com/link/346)
- [Review Production Orders](https://docs.muhasiberp.com/link/361)
- [Retire a Manufacturing Setup Record Safely](https://docs.muhasiberp.com/link/342)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Production Order**](https://docs.muhasiberp.com/link/346).</div>

# Create a Production Order

### How to Create a Production Order in Muhasib ERP

### Overview

This guide will help you create a production order with an initiated status and approved production scope.

Muhasib assigns a transaction number and stores the order for nested production processing.

### Who can do this

You need access to ProductionOrderAdd plus category, product, fiscal-year, and related master.

### Before you start

Confirm active fiscal year, category, document/reference, dates, products, quantities, BOMs, locations, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → Production Order.

### Create a Production Order

#### Step 1: Select New Record

#### Step 2: Confirm the default Initiated status

#### Step 3: Enter document number/reference, dates, category, and comments

#### Step 4: Add each item for production

#### Step 5: Review planned quantities and required details

#### Step 6: Select Save once

### Check your work

Reopen the order and confirm transaction/document numbers, status, category, dates, products, quantities, and creator.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Define an active fiscal year before transacting.
- Do not rely on deletion as a correction method.

### Related guides

- [Add a Product to a Production Order](https://docs.muhasiberp.com/link/347)
- [Update or Correct a Production Order](https://docs.muhasiberp.com/link/354)
- [Review Production Orders](https://docs.muhasiberp.com/link/361)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Add a Product to a Production Order**](https://docs.muhasiberp.com/link/347).</div>

# Add a Product to a Production Order

### How to Add a Product to a Production Order in Muhasib ERP

### Overview

This guide will help you add a product and planned output quantity to an existing production order.

The production product becomes the parent for WIP, overhead, expense, wastage, and shipment details.

### Who can do this

You need access to ProductionOrderProductsAdd plus product/item, BOM, location, batch, and production-order.

### Before you start

Confirm product, quantity, unit, destination, batch/serial plan, BOM, dates, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open Production Order → Add Item For Production.

### Add a Product to a Production Order

#### Step 1: Select the exact manufactured product

#### Step 2: Enter planned quantity and unit

#### Step 3: Confirm destination stock identity and supported details

#### Step 4: Review BOM and production prerequisites

#### Step 5: Save the product once

#### Step 6: Return to the parent order and confirm it appears once

### Check your work

Reopen Product Entry and confirm product, quantity, unit, location/batch details, and parent order link.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not add a raw material as the produced item by mistake.
- Check ProductionOrderProducts permission if the action is hidden.

### Related guides

- [Create a Production Order](https://docs.muhasiberp.com/link/346)
- [Add Raw Material and WIP Stages to a Production Product](https://docs.muhasiberp.com/link/348)
- [Record a Production Shipment](https://docs.muhasiberp.com/link/352)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Production Order**](https://docs.muhasiberp.com/link/346).</div>

# Update or Correct a Production Order

### How to Update or Correct a Production Order in Muhasib ERP

### Overview

This guide will help you correct an allowed production order and its nested records without hiding stock or accounting history.

Muhasib saves permitted corrections while retaining existing finalized effects according to nested rules.

### Who can do this

You need access to ProductionOrderUpdate and permissions for each affected nested workflow.

### Before you start

Identify original order, error, current status, finalized children, physical movement, stock/journal effects, correct result, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Production Order Inquiry → open the exact order → Update or relevant nested action.

### Update or Correct a Production Order

#### Step 1: Review the entire order and nested transaction chain

#### Step 2: Update descriptive/planning fields only while eligible

#### Step 3: Correct each stock- or cost-impacting child through its authorized workflow

#### Step 4: Do not rely on Production Order deletion

#### Step 5: Record reason and approval reference

#### Step 6: Reconcile order, stock, WIP, costs, shipments, and journals

### Check your work

Confirm order status, nested records, quantities, reports, stock ledger, cost, and general ledger.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Stop if a finalized child cannot be safely reversed.
- Never create undocumented offsetting WIP or wastage.

### Related guides

- [Create a Production Order](https://docs.muhasiberp.com/link/346)
- [Correct or Reverse a WIP Transaction](https://docs.muhasiberp.com/link/358)
- [Trace Manufacturing Transactions into Inventory and Accounts](https://docs.muhasiberp.com/link/364)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Production Order**](https://docs.muhasiberp.com/link/346).</div>

# WIP & Stock Movement

Issue, receive, move, finalize, and correct stock in work-in-process stages.

# Create a WIP Status

### How to Create a WIP Status in Muhasib ERP

### Overview

This guide will help you create an approved status used to describe work-in-process progress.

The status becomes selectable in allowed WIP entry forms.

### Who can do this

You need access to The available form reports WorkOrderStatus add/update/delete keys; check the effective role permission before use.

### Before you start

Confirm unique name, meaning, sequence, finalization compatibility, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → WIP Status.

### Create a WIP Status

#### Step 1: Search for an equivalent WIP status

#### Step 2: Select New Record

#### Step 3: Enter the approved name and supported attributes

#### Step 4: Confirm it clearly distinguishes operational progress

#### Step 5: Save once

### Check your work

Confirm the status is stored once and appears under the effective role permissions.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Check both WIP and Work Order Status permissions if the form is unexpectedly inaccessible.
- Do not delete historically used statuses.

### Related guides

- [Issue Stock to a Work Process](https://docs.muhasiberp.com/link/355)
- [Finalize a WIP Transaction](https://docs.muhasiberp.com/link/357)
- [Grant and Revoke Muhasib Permissions](https://docs.muhasiberp.com/link/187)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Issue Stock to a Work Process**](https://docs.muhasiberp.com/link/355).</div>

# Add Raw Material and WIP Stages to a Production Product

### How to Add Raw Material and WIP Stages to a Production Product in Muhasib ERP

### Overview

This guide will help you define the raw materials and work-process stages required for a production-order product.

The production product gains a staged material plan ready for authorized WIP movement.

### Who can do this

You need access to ProductionOrderWIPAdd plus product, raw-item, BOM, process, location, batch, and serial.

### Before you start

Have the approved routing, BOM, quantities, units, source locations, batches/serials, work processes, responsible party, and expected wastage.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open Production Order Product → Add WIP → WIP Line Items / raw-item actions.

### Add Raw Material and WIP Stages to a Production Product

#### Step 1: Select the intended work process

#### Step 2: Enter party/delivery and gate details where applicable

Enter party/delivery and gate details where needed.

#### Step 3: Add WIP line items

#### Step 4: Add/Edit each line's raw materials

#### Step 5: Confirm quantities, units, locations, batches, serials, and availability

#### Step 6: Add planned wastage only through its dedicated workflow

#### Step 7: Save child details and then the WIP record once

### Check your work

Reopen the nested hierarchy and compare and confirm product, process, raw materials, quantities, stock identities, and BOM.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not infer that saving reserves or consumes stock.
- Resolve missing batches/serials before finalization.

### Related guides

- [Add a Product to a Production Order](https://docs.muhasiberp.com/link/347)
- [Move Production Stock Between WIP Stages](https://docs.muhasiberp.com/link/349)
- [Record Production Wastage](https://docs.muhasiberp.com/link/351)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Add a Product to a Production Order**](https://docs.muhasiberp.com/link/347).</div>

# Move Production Stock Between WIP Stages

### Move Production Stock Between WIP Stages

### Overview

This guide will help you record an authorized movement of production material or output from one work process to another.

Muhasib records a WIP-stage movement; source/destination stock and journal effects require system checking.

### Who can do this

You need access to ProductionOrderWIP add/update plus both process, item, location, batch, and serial scopes.

### Before you start

Confirm source/destination processes, available WIP, quantities, units, batches/serials, party, gate details, status, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open Production Order Product → `Issue From WIP To WIP`.

### Move Production Stock Between WIP Stages

#### Step 1: Select the exact production product

#### Step 2: Choose distinct source and destination work processes

#### Step 3: Enter movement date, reference, party, and gate details

#### Step 4: Add WIP lines and raw-item details

#### Step 5: Confirm quantities and stock identities against available WIP

#### Step 6: Save once; finalize only after physical movement is confirmed

### Check your work

Compare and Confirm source and destination WIP, item/batch/serial quantities, status, gate pass, and journal entry.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Never select the same process on both sides.
- Search for the transaction before retrying.

### Related guides

- [Add Raw Material and WIP Stages to a Production Product](https://docs.muhasiberp.com/link/348)
- [Finalize a WIP Transaction](https://docs.muhasiberp.com/link/357)
- [Reconcile the Production Order Stock Ledger](https://docs.muhasiberp.com/link/363)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Add Raw Material and WIP Stages to a Production Product**](https://docs.muhasiberp.com/link/348).</div>

# Issue Stock to a Work Process

### How to Issue Stock to a Work Process in Muhasib ERP

### Overview

This guide will help you issue available items and raw materials into the selected work process.

Muhasib stores a WIP transaction with an automatic transaction number; stock/account effects become final according to system finalization rules.

### Who can do this

You need access to WorkOrderWipAdd plus item, location, batch/serial, process, party, and fiscal-year.

### Before you start

Confirm active fiscal year, target process, source stock, product/raw items, quantities, locations, batches/serials, party, gate details, status, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → Issue Stock to WIP; runtime title: `Issue to {process}`.

### Issue Stock to a Work Process

#### Step 1: Select the target work process

#### Step 2: Enter document number, party, delivery staff, gate details, and comments

#### Step 3: Select status

#### Step 4: Add WIP line items and raw-item detail

#### Step 5: Resolve every insufficient-quantity message

Resolve every inenough-quantity message.

#### Step 6: Save once; finalize only after physical issue is confirmed

### Check your work

Compare and Confirm transaction, gate pass, source stock, target WIP, batches/serials, status, and journal.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Define an active fiscal year and status before saving.
- Do not bypass inenough-stock check.

### Related guides

- [Finalize a WIP Transaction](https://docs.muhasiberp.com/link/357)
- [Issue Stock from a Work Process](https://docs.muhasiberp.com/link/356)
- [Review WIP In and WIP Out Transactions](https://docs.muhasiberp.com/link/359)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Finalize a WIP Transaction**](https://docs.muhasiberp.com/link/357).</div>

# Issue Stock from a Work Process

### How to Issue Stock from a Work Process in Muhasib ERP

### Overview

This guide will help you record items leaving a selected work process for the next authorized destination.

Muhasib stores a WIP transaction with an automatic number; the available source does not consistently enforce the same quantity checks as WIP Out.

### Who can do this

You need access to WorkOrderWipAdd plus item, process, location, batch/serial, party, and fiscal-year.

### Before you start

Confirm active fiscal year, source process, output/raw details, quantities, destinations, batches/serials, party, gate details, status, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → Issue Stock from WIP; runtime title: `Issue from {process}`.

### Issue Stock from a Work Process

#### Step 1: Select the source work process

#### Step 2: Enter document number, party, delivery staff, gate details, and comments

#### Step 3: Select status

#### Step 4: Add WIP lines and relevant raw-item detail

#### Step 5: Confirm quantities and identities against physical output

#### Step 6: Save once; finalize only after handover is confirmed

### Check your work

Compare and Confirm source WIP, destination/finished stock, quantities, identities, gate pass, status, and journal.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not interpret the class/form name alone as stock direction; follow the system process title.
- Manually compare and confirm availability where check is absent.

### Related guides

- [Issue Stock to a Work Process](https://docs.muhasiberp.com/link/355)
- [Finalize a WIP Transaction](https://docs.muhasiberp.com/link/357)
- [Reconcile the Production Order Stock Ledger](https://docs.muhasiberp.com/link/363)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Issue Stock to a Work Process**](https://docs.muhasiberp.com/link/355).</div>

# Finalize a WIP Transaction

### Finalize a WIP Transaction

### Overview

This guide will help you finalize a saved WIP movement after reconciling physical items, status, and supporting details.

Muhasib marks the WIP record finalized and processes its stock/account consequences according to the active workflow.

### Who can do this

You need access to WorkOrderWip update/finalization and relevant stock/report permissions.

### Before you start

Confirm transaction number, status, product/raw lines, quantities, batches/serials, party, gate details, physical handover, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open the saved WIP record and select the runtime `Finilize` action.

### Finalize a WIP Transaction

#### Step 1: Reopen the exact saved record

#### Step 2: Review header, status, line, raw-material, and stock-identity details

#### Step 3: Resolve incomplete or unavailable quantities

#### Step 4: Confirm physical movement and approval

#### Step 5: Select Finilize once and accept confirmation

#### Step 6: Record final status and generated transaction/journal evidence

### Check your work

Confirm finalized status, WIP inquiry, stock balances, production-order ledger, gate pass, and journal entry.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not repeat finalization after a delayed response until status is checked.
- Resolve missing status or stock messages before retrying.

### Related guides

- [Issue Stock to a Work Process](https://docs.muhasiberp.com/link/355)
- [Issue Stock from a Work Process](https://docs.muhasiberp.com/link/356)
- [Correct or Reverse a WIP Transaction](https://docs.muhasiberp.com/link/358)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Issue Stock to a Work Process**](https://docs.muhasiberp.com/link/355).</div>

# Correct or Reverse a WIP Transaction

### Correct or Reverse a WIP Transaction

### Overview

This guide will help you correct an wrong WIP movement while preserving physical, inventory, and accounting record history.

The error is corrected through an auditable chain; exact reversal support awaits system confirmation.

### Who can do this

You need access to WorkOrderWipUpdate or approved reversal rights; delete permission alone is not business authorization.

### Before you start

Identify original record, error, finalization state, later WIP/stock movements, journal, physical position, correct result, and approval.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

WIP In/Out Inquiry → View Record.

### Correct or Reverse a WIP Transaction

#### Step 1: Open the exact transaction and full downstream chain

#### Step 2: Update safe details only while the record remains eligible

#### Step 3: For finalized stock-impacting errors, use the product-approved reversal/counter-movement method

#### Step 4: Do not delete a record merely because the UI/source permits it

#### Step 5: Record reason, approval, and replacement reference

#### Step 6: Reconcile every affected process, stock identity, and account

### Check your work

Confirm original/replacement status, WIP and production ledgers, stock balances, gate records, and journals.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Escalate if later stages consumed the wrong WIP.
- Never correct only one side of a process transfer.

### Related guides

- [Finalize a WIP Transaction](https://docs.muhasiberp.com/link/357)
- [Review WIP In and WIP Out Transactions](https://docs.muhasiberp.com/link/359)
- [Trace Manufacturing Transactions into Inventory and Accounts](https://docs.muhasiberp.com/link/364)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Finalize a WIP Transaction**](https://docs.muhasiberp.com/link/357).</div>

# Reconcile the Production Order Stock Ledger

### How to Reconcile the Production Order Stock Ledger in Muhasib ERP

### Overview

This guide will help you explain a production order's stock balance from opening/planned position through WIP, wastage, shipment, and output movements.

You get a transaction-level production stock explanation and focused checking exceptions.

### Who can do this

You need access to ProductionOrderStockLedgerReport; separate PrintReports and set up email access may apply.

### Before you start

Know the production order, cutoff, product/raw items, expected movement chain, and physical/control balances.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → Production Order Stock Ledger Report.

### Reconcile the Production Order Stock Ledger

#### Step 1: Select the production order and exact period

#### Step 2: Select Filter

#### Step 3: Confirm opening or initial planned/stock position

#### Step 4: Trace issues to/from WIP, transfers between processes, wastage, shipments, and

Trace issues to/from WIP, transfers between processes, wastage, shipments, and produced output.

#### Step 5: Recalculate running quantities and values

#### Step 6: Compare closing to Production Order Stock and general Stock Ledger

#### Step 7: Print or email only after verifying recipient and scope

### Check your work

Opening plus valid inflows minus outflows equals the shown closing balance and agrees with stock/control reports.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Check backdated and unfinalized WIP records.
- Do not email production data to an unverified recipient.

### Related guides

- [Review Production Order Stock](https://docs.muhasiberp.com/link/362)
- [Review WIP In and WIP Out Transactions](https://docs.muhasiberp.com/link/359)
- [Trace Manufacturing Transactions into Inventory and Accounts](https://docs.muhasiberp.com/link/364)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Review Production Order Stock**](https://docs.muhasiberp.com/link/362).</div>

# Inquiries

Review production status, transactions, orders, stock, history, and gate passes.

# Review Status History and Print a Gate Pass

### How to Review Status History and Print a Gate Pass in Muhasib ERP

### Overview

This guide will help you check a production/WIP status trail and produce the correct gate pass for an authorized movement.

You get evidence of process status and an authorized movement document; printing should not itself post stock.

### Who can do this

You need access to WIP view plus history and print permissions where enforced.

### Before you start

Confirm the saved transaction, current status, party, delivery staff, gate number/pass, item quantities, and physical authorization.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Open the production/WIP record → Show Status History or Print Gate Pass.

### Review Status History and Print a Gate Pass

#### Step 1: Verify transaction number and production context

#### Step 2: Review status sequence, timestamps, and users

#### Step 3: Resolve missing or invalid transitions before movement

#### Step 4: Open gate-pass preview

#### Step 5: Confirm party, gate, item, quantity, batch/serial, and reference

#### Step 6: Print one controlled copy and mark duplicates according to policy

### Check your work

Match history and gate pass to the saved WIP transaction and physical handover.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not print from an unsaved or wrong-stage record.
- Check Print Reports permission and template/printer settings.

### Related guides

- [Move Production Stock Between WIP Stages](https://docs.muhasiberp.com/link/349)
- [Finalize a WIP Transaction](https://docs.muhasiberp.com/link/357)
- [Resolve Muhasib Printing Setup Problems](https://docs.muhasiberp.com/link/173)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Move Production Stock Between WIP Stages**](https://docs.muhasiberp.com/link/349).</div>

# Review WIP In and WIP Out Transactions

### How to Review WIP In and WIP Out Transactions in Muhasib ERP

### Overview

This guide will help you find and inspect a WIP movement and determine its process, direction, status, lines, and correction needs.

You get a source-level view of the WIP transaction and its current state.

### Who can do this

You need access to WipInInquiry or WipOutInquiry and access to the underlying WIP record.

### Before you start

Have transaction/document number, process, party, date range, status, item, or gate reference.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → WIP In Inquiry or WIP Out Inquiry.

### Review WIP In and WIP Out Transactions

#### Step 1: Select company and narrow date range

#### Step 2: Filter by available identifiers

#### Step 3: Confirm runtime Issue to or Issue from process meaning

#### Step 4: Select View Record

#### Step 5: Review header, status, lines, raw items, quantities, identities, gate details,

Review header, status, lines, raw items, quantities, identities, gate details, and journal.

#### Step 6: Record any correction or follow-up required

### Check your work

Match inquiry row to the detailed record, physical/gate evidence, production order, stock, and journal.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Check both WIP In and WIP Out when direction terminology is uncertain.
- Expand date scope and confirm company when a known record is missing.

### Related guides

- [Review WIP In and WIP Out Summary Reports](https://docs.muhasiberp.com/link/360)
- [Correct or Reverse a WIP Transaction](https://docs.muhasiberp.com/link/358)
- [Reconcile the Production Order Stock Ledger](https://docs.muhasiberp.com/link/363)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Review WIP In and WIP Out Summary Reports**](https://docs.muhasiberp.com/link/360).</div>

# Review Production Orders

### How to Review Production Orders in Muhasib ERP

### Overview

This guide will help you find a production order, assess its status and nested progress, and identify the next authorized action.

You get an end-to-end view of production-order progress without changing it.

### Who can do this

You need access to ProductionOrderInquiry plus view access to the selected order and nested records.

### Before you start

Have order/transaction/document number, category, status, product, date range, or creator.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → Production Order Inquiry.

### Review Production Orders

#### Step 1: Select company and date range

#### Step 2: Filter by order, category, status, product, or user where supported

#### Step 3: Open the exact production order

#### Step 4: Review products, WIP, raw material, overhead, expense, wastage, shipment, and

Review products, WIP, raw material, overhead, expense, wastage, shipment, and status.

#### Step 5: Compare planned, processed, and remaining quantities

#### Step 6: Record the next action or exception

### Check your work

Match the inquiry status and totals to the parent order, nested records, stock reports, and physical production evidence.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Expand the date range and clear status filters for missing orders.
- Do not treat Initiated as proof that stock was issued.

### Related guides

- [Create a Production Order](https://docs.muhasiberp.com/link/346)
- [Review Production Order Stock](https://docs.muhasiberp.com/link/362)
- [Update or Correct a Production Order](https://docs.muhasiberp.com/link/354)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Production Order**](https://docs.muhasiberp.com/link/346).</div>

# Review Production Order Stock

### How to Review Production Order Stock in Muhasib ERP

### Overview

This guide will help you determine the stock quantity and value linked to production orders and items.

You get a scoped production-stock position for operational review.

### Who can do this

You need access to ProductionOrderStockReport; PrintReports is required for printing.

### Before you start

Know the company, date range, production order, item, process/location, and expected quantities.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → Production Order Stock Report.

### Review Production Order Stock

#### Step 1: Select exact date/company scope

#### Step 2: Select item and production-order filters where supported

#### Step 3: Select Filter

#### Step 4: Review raw, WIP, wastage, shipment, and produced quantities/value shown

#### Step 5: Compare exceptions with order and WIP inquiries

#### Step 6: Print only after verifying filters

### Check your work

Compare and Confirm report totals to production orders, WIP transactions, wastage, shipments, and the general stock ledger.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Confirm whether saved and finalized transactions are both included.
- Check unit conversions and stock identity filters.

### Related guides

- [Review Production Orders](https://docs.muhasiberp.com/link/361)
- [Reconcile the Production Order Stock Ledger](https://docs.muhasiberp.com/link/363)
- [Review WIP In and WIP Out Summary Reports](https://docs.muhasiberp.com/link/360)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Review Production Orders**](https://docs.muhasiberp.com/link/361).</div>

# Reports

Analyze work-in-process, production orders, production stock, and ledger movements.

# Review WIP In and WIP Out Summary Reports

### How to Review WIP In and WIP Out Summary Reports in Muhasib ERP

### Overview

This guide will help you summarize WIP movements by period, process, party, and other supported filters and compare and confirm them to detail.

You get a scoped WIP summary for operational checking.

### Who can do this

You need access to WipInReport or WipOutReport; PrintReports is separately checked for printing.

### Before you start

Know the company, period, process, party, expected transaction count/value, and report purpose.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing → WIP In Report or WIP Out Report.

### Review WIP In and WIP Out Summary Reports

#### Step 1: Select exact date/company scope

#### Step 2: Choose person/process and other filters

#### Step 3: Select Filter

#### Step 4: Review count, quantities, values, and statuses

#### Step 5: Drill or cross-reference exceptions to WIP inquiries

#### Step 6: Print only after confirming scope and Print Reports permission

### Check your work

Sample rows to source transactions and confirm summary totals equal the same filtered inquiry/detail population.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Confirm whether drafts and finalized records are both included.
- Check unit and sign conventions before comparing In with Out.

### Related guides

- [Review WIP In and WIP Out Transactions](https://docs.muhasiberp.com/link/359)
- [Review Production Order Stock](https://docs.muhasiberp.com/link/362)
- [Reconcile the Production Order Stock Ledger](https://docs.muhasiberp.com/link/363)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Review WIP In and WIP Out Transactions**](https://docs.muhasiberp.com/link/359).</div>

# Troubleshooting

Resolve production setup, stock movement, WIP, finalization, and correction problems.