# Prepare Muhasib for Manufacturing

### How to Prepare Muhasib for Manufacturing in Muhasib ERP

### Overview

This guide will help you establish the masters, stock, accounts, statuses, processes, and permissions needed for controlled production.

Authorized users can create and progress production records against controlled prerequisites.

### Who can do this

You need access to Relevant Manufacturing view/add/update rights plus item, BOM, inventory, fiscal-year, account, and report.

### Before you start

Confirm active fiscal year, production model, locations, manufactured items, BOMs, units, raw stock, work processes, statuses, overhead/expense accounts, and role separation.

<div id="bkmrk-%F0%9F%9A%A8-importantmake-sure" style="border-left: 4px solid #dc2626; background: #fef2f2; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Before saving, check that the correct company is open and that you have permission to complete this task.</div>### Where to find it

Back Office → Manufacturing and Items &amp; Advanced Inventory.

### Prepare Muhasib for Manufacturing

#### Step 1: Confirm whether the deployment uses Work Orders, Production Orders, or

Confirm whether the deployment uses Work Orders, Production Orders, or both.

#### Step 2: Verify manufactured items and approved BOMs

#### Step 3: Create required process, status, and category masters

#### Step 4: Confirm raw-material, WIP, finished-goods, wastage, overhead, and expense locations/accounts

#### Step 5: Verify fiscal period and transaction numbering

#### Step 6: Test permissions and one representative production lifecycle in an isolated

Test permissions and one representative production lifecycle in an isolated database.

### Check your work

Confirm all required masters are selectable and a test lifecycle reconciles quantities, statuses, stock, and accounts.

<div id="bkmrk-%F0%9F%92%A1-tipcheck-the-saved" style="border-left: 4px solid #2563eb; background: #eff6ff; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">Take a moment to check your work before closing the window. This small check can save time later.</div>### If something goes wrong

- Do not begin live production with incomplete BOMs or account mappings.
- Resolve ambiguity between Work Order and Production Order with the product owner.

### Related guides

- [Create a Work Order](https://docs.muhasiberp.com/link/343)
- [Create a Production Order](https://docs.muhasiberp.com/link/346)
- [Create an Item Bill of Materials](https://docs.muhasiberp.com/link/322)

### What to do next

<div id="bkmrk-%E2%9C%85-next-actioncontinu" style="border-left: 4px solid #16a34a; background: #f0fdf4; padding: 12px 16px; margin: 15px 0; border-radius: 4px;">[**Create a Work Order**](https://docs.muhasiberp.com/link/343).</div>