Skip to main content

Record Production Wastage

How to Record Production Wastage in Muhasib ERP

Overview

This guide will help you record approved material wastage against the correct production product and WIP stage.

Muhasib records wastage and may reduce WIP quantity/value and recognize a wastage cost.

Who can do this

You need access to ProductionOrderWastage plus item, location, batch/serial, and production WIP.

Before you start

Physically check item, quantity, unit, location, batch/serial, stage, reason, recoverable value, evidence, and approval.

Before saving, check that the correct company is open and that you have permission to complete this task.

Where to find it

Open Production Order Product → WIP → WIP Wastage Items → Add Wastage Items.

Record Production Wastage

Step 1: Select the correct WIP stage

Step 2: Choose the wasted item and exact stock identity

Step 3: Enter quantity, unit, reason, and supported value details

Step 4: Confirm the quantity does not exceed eligible WIP stock

Confirm the quantity does not exceed allowed WIP stock.

Step 5: Save once

Step 6: Review related stock and journal effects

Check your work

Compare and Confirm wastage record, physical evidence, WIP balance, production-stock ledger, product cost, and journal.

Take a moment to check your work before closing the window. This small check can save time later.

If something goes wrong

  • Do not use wastage to conceal unexplained stock loss.
  • Correct wrong stock identities through an authorized reversal path.

What to do next